Renova ConceptGeneral contractorMonaco

Masonry, electrical, air conditioning, plumbing, joinery and finishes. Our own teams, a single point of contact, from strip-out to handover.
We renovate apartments and villas where nothing goes unnoticed: the edge of a partition, a marble joint, the alignment of a door. That is exactly where we work.
Precision masonry, bespoke joinery, marble bathrooms, high-end finishes. Our own teams carry out the work, with drawings, set-out lines and checks at every stage.
The result comes from discipline, not luck. Substrate preparation, testing before closing up, room-by-room sign-off: nothing is closed until it is true and matches the drawing.
The Principality of Monaco and the Alpes-Maritimes coast, for private clients, interior architects and building managers. One site manager per project, reachable directly.
Every photograph comes from a project we delivered. In this market, that is the one thing nobody can copy.






A project is judged close up. A marble vein that runs on from one panel to the next, a 2 mm joint held over three metres, a walnut veneer whose grain does not break at the corner. It takes time, it cannot be read off a quotation, and it is the whole difference between a renovation and ours.



Every trade is in-house. The same craftsmen are there from the first chisel stroke to the last coat of lacquer, and they all answer to the same site manager.
Laser set-out, sharp edges, flat substrates. Careful masonry is half of a successful finish.
Drawn for the room, built in the workshop, installed by our own joiners. Even reveals, matched veneers, selected hardware.
Slab layout, veining matched from panel to panel, tanking beneath the tiling and water testing before closing up.
Lighting is decided with the architect, not after the ceilings go up. High-end wiring accessories, compliance certificate issued.
Designed together with the false ceiling so that only a grille remains visible. Calculated airflows, controlled sound levels.
Full skimming, sanding between coats, two coats minimum. Raking light is our judge, not the site lamp.
Four stages, announced deadlines, and a quotation in which you understand every line.
Survey, access and co-ownership constraints, first technical options.
Within 48 working hoursA price per item and per room, materials and labour shown separately.
Within 5 to 10 daysWritten phasing, DAU and highway applications, a site manager you can reach.
Weekly reviewSnagging cleared, as-built file, warranties and certificates.
Ten-year insurance, RC PremiumDescribe your apartment in a few lines. We come back to you within 48 working hours to arrange a visit.